GuangDong HuaAo New Alloy Material Co.,Ltd. Aerospace Materials and Products 18,500 Ton Project Environmental Impact Assessment First Public Announcement


 GuangDong HuaAo New Alloy Material Co.,Ltd. Aerospace Materials and Products18500Tons project environmental impact assessment first public announcement

 

According to the "Environmental Impact Assessment Law of the People's Republic of China" and the "Measures for Public Participation in Environmental Impact Assessment" and other relevant regulations, the followingGuangdong Hua'ao Alloy New Materials Co., Ltd. Aerospace Materials and Products18500Tons projectrelated environmental impact assessment matters arefirstpublicly announced.

1. Basic information about the project

1Current project situation

1)Currentproject main environmental protection procedures situation

In 2006yearNovemberobtainedthe approval of the environmental impact report for the new project of He City Juteng Stainless Steel Products Co., Ltd. with an annual output of 9000 tons of stainless steel bars and 1000 tons of stainless steel products9000tons, stainless steel products1000tons new project environmental impact report(He Huan Ji[2006]19number)and onJuly 2011obtained the letter of acceptance for the completion of environmental protection for the annual output of stainless steel bars project of Guangdong Hua'ao Stainless Steel Products Co., Ltd. (He Huan Yanyear[2011]12number);In 20209000tons, stainless steel products1000the environmental impact report for the expansion project of Guangdong Hua'ao Alloy New Materials Co., Ltd. with an annual output of 2000 tons of high-temperature alloy bars and 300 tons of alloy powder(Jiang He Huan Shen〔

98number), currently carrying outyear[2011]12obtainedthe environmental acceptance of the production line for the annual output of tons of high-temperature alloy barswork, the production line for the annual output of alloy powdertonshas not yet been constructed;In June 2021(He Huan Jithe environmental impact report for the technical transformation of the annual output of tons of casting master alloy production line and the expansion project of 20000 tons of nickel alloynumber), currently carrying out61the project is currently under construction.2Project environmental protection situationwork, the production line for the annual output of alloy powder) Waste gas:1#Workshophas not yet been constructed;3sets of waste gas treatment devices, under construction

98sets of waste gas treatment devices,year2#obtained3#9000under constructionsets of waste gas treatment devices, various waste gases meet the corresponding emission standards and are discharged through exhaust pipes.) Wastewater: The existing project has no production wastewater, and domestic wastewater is treated by the self-built sewage treatment station in the factory area to meet the Guangdong Province "Water Pollutant Discharge Limits" ((He Huan Jithe environmental impact report for the technical transformation of the annual output of tons of casting master alloy production line and the expansion project of 20000 tons of nickel alloysets of waste gas treatment devices,61) second period first-level standard and "Urban Sewage Reuse Urban Miscellaneous Water Quality"and on( GB/T18920-2002

) Greening, flushing toilets, and road cleaning meet the stricter values,)Currentpart of it is discharged into the Minzu River, and part

1is reused within the factory.) Noise: Measures such as basic vibration reduction, sound insulation of the factory building, soft connection of fan inlet and outlet, and installation of silencers are taken4Current) Solid waste: The factory area has built compliant general industrial solid waste storage places and hazardous waste storage places, hazardous waste is disposed of by qualified external units, and solid waste is fully recycled or properly disposed of.The basic situation of this expansion project) Solid waste: The factory area has built compliant general industrial solid waste storage places and hazardous waste storage places, hazardous waste is disposed of by qualified external units, and solid waste is fully recycled or properly disposed of.Project name:Construction location:4Current) Solid waste: The factory area has built compliant general industrial solid waste storage places and hazardous waste storage places, hazardous waste is disposed of by qualified external units, and solid waste is fully recycled or properly disposed of.Project name:Located in4He City, Hecheng Town, Industrial Zone II (northeast of the existing project)) Solid waste: The factory area has built compliant general industrial solid waste storage places and hazardous waste storage places, hazardous waste is disposed of by qualified external units, and solid waste is fully recycled or properly disposed of.Construction content:

) Greening, flushing toilets, and road cleaning meet the stricter values,)废水:现有项目无生产污水,生活污水经厂区内自建污水处理站处理达广东省《水污染物排放限值》(DB44/26-2001)第二时段一级标准和《城市污水再生利用城市杂用水水质》( GB/T18920-2002)绿化、冲厕、道路清扫较严值后,部分排入民族河,部分厂内回用。

) Solid waste: The factory area has built compliant general industrial solid waste storage places and hazardous waste storage places, hazardous waste is disposed of by qualified external units, and solid waste is fully recycled or properly disposed of.)噪声:采取基础减振、厂房隔声、风机进出口软连接、安装消声器降噪措施

4)固废:厂区内已建设符合规范的一般工业固废贮存场所、危险废物贮存场所,危险废物外委有资质的单位处置,固体废物全部综合利用或妥善处置。

) Greening, flushing toilets, and road cleaning meet the stricter values,、本次扩建项目基本情况

1)项目名称:Guangdong Hua'ao Alloy New Materials Co., Ltd. Aerospace Materials and Products18500Tons project

) Greening, flushing toilets, and road cleaning meet the stricter values,)建设地点:位于鹤山市鹤城镇工业二区(现有项目的东北面)

) Solid waste: The factory area has built compliant general industrial solid waste storage places and hazardous waste storage places, hazardous waste is disposed of by qualified external units, and solid waste is fully recycled or properly disposed of.)建设内容:Investment12#100 million yuan, new land area66704.75square meters,Proposed new construction5#2##[2011]12#8#factories, new annual production90003high-temperature alloy production line, annual production1500tons of powder alloyproduction line, annual production8000tons of high-quality aluminum castingsproduction line. The main new equipment includes vacuum induction furnaces, resistance melting furnaces, electron beam remelting furnaces, etc.

II. Construction unit and contact information

Construction unit:Guangdong Huaao Alloy New Materials Co., Ltd.

Contact person:Ms. Guo     Contact number:0750-8383030

Email:guowenxiang_huaao@163.com

Mailing address:Crown Avenue, Industrial Zone 2, Hecheng Town, Heshan City) Greening, flushing toilets, and road cleaning meet the stricter values,2#No.

III. Name of the unit preparing the environmental impact report

Environmental impact assessment report preparation unit: Guangdong Zhihuan Innovation Environmental Technology Co., Ltd. 

IV. Main matters for public opinion solicitation

If you have suggestions or opinions on the construction project, you can download and fill out the public opinion form for the environmental impact assessment of the construction project to provide your feedback (Note: According to the "Measures for Public Participation in Environmental Impact Assessment", opinions or demands related to land acquisition, demolition, property, employment, etc., that are not related to the project environmental impact assessment do not belong to the public participation content of the project).

The public opinion form for the environmental impact assessment of the construction project is attached1

V. Ways and means to submit public opinions

After fully filling out the public opinion form for the environmental impact assessment of the construction project, send it to the construction unit via email or by mail.

Public opinions include the date of filling, public opinions, public information, etc. Please be sure to fill in truthfully and completely so that we can provide feedback to you. Your personal (or group) information will not be disclosed without permission (unless otherwise stipulated by laws and regulations).

  Guangdong Huaao Alloy New Materials Co., Ltd.

2022year1number);20day

Attachment1: Public opinion form for the environmental impact assessment of the construction project

Related News


Announcement of the grading evaluation of GuangDong HuaAo New Alloy Material Co.,Ltd.

According to the letter from the Jiangmen Human Resources and Social Security Bureau regarding the approval for GuangDong HuaAo New Alloy Material Co.,Ltd. to carry out vocational skill level certification work.


Public announcement before the approval of the environmental impact assessment for the technical transformation of the 9000 tons annual production line of casting master alloy and the expansion project of 20000 tons annual production of nickel alloy

According to the "Environmental Impact Assessment Law of the People's Republic of China", the State Council Order No. 682 "Regulations on the Management of Environmental Protection for Construction Projects", and the requirements of the "Measures for Public Participation in Environmental Impact Assessment" (Order No. 4 of the Ministry of Ecology and Environment)


The first public announcement of the environmental impact assessment for the expansion project of GuangDong HuaAo New Alloy Material Co.,Ltd. with an annual production capacity of 100,000 tons of high-alloy.

According to the "Environmental Impact Assessment Law of the People's Republic of China" and the "Measures for Public Participation in Environmental Impact Assessment" and other relevant regulations, the first public announcement regarding the "Expansion Project of GuangDong HuaAo New Alloy Material Co.,Ltd. with an annual production of 100,000 tons of high-alloy" is now made.